The Challenge

To significantly reduce energy and waste cost without capital expenditure.
Include certain building improvements within a shared energy solution.

The Solution

Completely replace the dilapidated roof with an insulated and solar solution.
Almost eliminate Red Waste within the manufacturing process.
Reduce the energy and waste cost by circa £300k per year.

%

Electricity Purchased

%

Gas Purchased

%

Steam Cost

%

Renewable Energy

The Old Roof

The original roof was in very poor condition. It had been patched many times and was overdue for replacement.

Solar Replacement Roof

The old roof was replaced with a high insulated panels with solar panels to produce significant energy fully used by the organisation.

Waste Reduction Graph

The reduction of the various waste streams saved the organisation significant money